Capital Planning & Budget
University of Wisconsin System Capital Assets
The University of Wisconsin System has approximately 1,814 buildings totaling 57 million gross square feet of space with replacement costs of nearly $6.5 billion. This accounts for 63% of the total state-owned facilities in Wisconsin. The Board of Regents holds title to approximately 18,000 acres of land throughout Wisconsin, the majority of which has been donated to the university and is deed restricted for research and nature preserves. About 4,600 acres comprise the main campuses of the 13 universities.
While the portfolio of UW System facilities includes buildings from the mid-1800’s, approximately 70% were constructed in the last 30 to 40 years. Most of these buildings were built to 30-year life expectancy standards and are in need of significant maintenance and renovation.
The University of Wisconsin System has made significant investments to meet maintenance needs through biennial capital budgets in recent years, however, a backlog continues to grow. In order to address this backlog, the state and universities are investing in major remodeling projects of entire facilities.
Capital Budget
The quality of education depends on careful integration of curriculum, faculty, and facilities. Long range physical planning for campuses of the University of Wisconsin System is an ongoing process designed to provide appropriate facilities in response to the dynamics of higher education. Each university has a Campus Development Plan that defines overall land use patterns, identifies potential construction needs, and serves as an illustration to ensure cohesive, aesthetic development compatible with the community and environment.
The Capital Budget is generally the mechanism for universities to receive funding for facilities needs. Those needs defined within the parameters of the Campus Development Plan, are more specifically stated in a Six Year Facilities Plan.
The Six Year Facilities Plan aids the campus by identifying long‑term program directions and describing their effect on the institution's facilities needs. The Six Year Plan is required for each institution by Sections 16.84(6) and 13.48(6) of the Wisconsin Statutes.
Because the Campus Development Plan and Six Year Facilities Plan reflect the needs of students, faculty and staff, and the local communities, extensive participation in the preparation of the plans is warranted. Each university has established Campus Planning Committees that involve the various affected entities within the institution. Additionally, separate committees are established for individual major projects. Those committees include representatives of the user groups of the proposed facility.
The UW System Office of Capital Planning and Budget is responsible for formulating a biennial capital budget request for consideration by the Board of Regents. Once approved by the Regents, the budget request is submitted to the Department of Administration’s Division of State Facilities (DSF). The division prepares a capital budget request for all state agencies and introduction by the Governor in the biennial budget process.
There are three primary sources of funding for capital projects.
- General Fund Supported Borrowing (GFSB) 20-year state-issued bonds repaid with GPR
- Program Revenue Supported Borrowing (PRSB) 20-year state-issued bonds repaid with UW program revenue
- Gift and Grant funds
Construction and maintenance projects are approved in two chief categories:
- Major Projects – require specific enumeration and cost $500,000 or more.
- All Agency Projects – require Building Commission approval from a fund for capital maintenance
The Wisconsin State Building Commission
The State of Wisconsin Building Commission is an eight-member body consisting of the Governor, three senators and three representatives, and one citizen member who is appointed by Governor.
The Building Commission is subdivided into two Subcommittees: a Higher Education Subcommittee and an Administrative Affairs Subcommittee. The Higher Education Subcommittee is responsible for reviewing building program requests of the University of Wisconsin System. The Administrative Affairs Subcommittee is responsible for reviewing building program requests of all other state agencies.
Every two years, as part of the biennial budget process, the Building Commission recommends to the Legislature a state building program, which includes a list of projects and funding sources to meet the state’s capital improvement and maintenance needs over the following two-year budget cycle.
The All Agency program, provides funding to the Building Commission to support general categories of repair and renovation projects. The UW System is given a funding allocation from which to request specific projects for construction. The UW System manages these requests on a competitive basis and submits projects to the Division of State Facilities and state commission for approval.
As required under WI Stats. s. 13.48 (7), the Building Commission’s capital budget recommendations are forwarded to the Legislature’s Joint Committee on Finance by the first Tuesday in April. The committee reviews the recommendations and may modify them before incorporating the capital budget into the biennial operating budget. Both houses of the Legislature take up the capital budget as part of their deliberations on the biennial budget.
Implementation of the Building Program
After projects are approved in the capital budget the Building Commission must again review and approve each project. Upon recommendation of the campus and System Administration, the Division of State Facilities advertises for, hires and contracts with an Architectural or Engineering firm (AE) to prepare preliminary designs. When the preliminary design work reaches 35%, a design report is prepared that describes the proposed design, budget and schedule. Before construction can proceed, the Building Commission must approve the design report. If it is approved, the A/E firm completes final construction documents DSF solicits construction bids. State statutes require that contracts be awarded to the lowest qualified responsible bidder, unless the Building Commission has approved an alternative method.
All building projects in excess of $100,000 must be approved by the Building Commission prior to construction. For projects under this threshold, the DSF is authorized under the Small Projects Program (13.48 (10), (29)) to design and bid projects upon request of the universities.